In May 2013 we signed the contract with OAG to support the shipyard with Project Management. Globaltic Marine start on the First of June 2013. After 5 months we had in week 43 the first two seatrials. Last week we did the DP 2 seatrials. Yesterday the ABIS DUISBURG left the harbour of Mukran ( Germany ) for the maiden voyage to Harlingen, The Netherlands where she will arrived on tuesday. http://www.youtube.com/watch?v=gDWbPVJOElE
In August we sail the ship from Delfzijl, The Netherlands to Gdynia Poland, there we will drydock the ship and make new cabins in the ”old” winch room.
MV Damina arrived in Gdynia, where will will make a modification of the cable pipe on deck, renew cables, make 3 new cable pull boxes.
On the 4 th of may 2013, MV Alert arrived at our yard in Gdynia, We will do the following jobs, exchange both main engines, exchange both auxiliary engine, modification of engine room systems, placing of two ( 5 m3) tanks, modification of bridge equipment, refresh inside accommodation.